ISLAMABAD: Pakistan has decided to revalidate the survey of the 80 km Pak-Iran gas pipeline before its construction.
According to the sources of Petroleum Division, before the construction of Pak-Iran Gas Pipeline, the pipeline survey will be re-verified, as the survey and engineering design of this project is quite old, consultants will be hired for new survey and engineering design.
Sources said that Pakistan is taking all possible steps to avoid a possible fine of 18 billion dollars.